Email:sales@castingindustrial.com Qingdao Antai Import and Export Co.,Ltd

Qingdao Antai Import and Export Co.,Ltd

Procurement Process From Our Factory

Follow below process for all products:


1.Detailed Drawings for OEM parts.


CAD/PDF drawing to show:

Tolerance

Material Grade

Unit weight

Surface treatment

Packing requirement

Other requirement


2.Pattern or Tools


Generally the tools will need 20days.


3.Sample


Once the pattern is ok, the first castings will be arranged immediately. 

Sand casting need about 15days, and investment casting need about 20days.


4.Sample Test


You can customize body, header, left side, right side and footer of each page independently.


5.Sample Approval


We will send the samples to our clients for final confirmation after we have finished the production. After receiving the confirmation from the clients,we will arrange for the bulk production. 


6.Bulk Production


We will update the bulk production status every week.


7.Inspection before delivery


Material Inspection


Dimension Inspection


Packing Inspection


Production Apperance


8.Quality feedback


When the goods arrived destination,clients need to give us a quality feedback within 7days.


Previous: No Information

Next: OUR FACTORY QUALITY CONTROL

Copyright © Qingdao Antai Import and Export Co.,Ltd. All Rights Reserved.
QR Code